@@ -6,6 +6,54 @@
|
||||
公告;20.1 发布确认和 20.2 多平台复测已完成,最终发布前仍需完成更大规模
|
||||
longrun 和剩余 PARTIAL 能力的工程化收束。
|
||||
|
||||
## 2026-06-30 V5.11 Scope Update
|
||||
|
||||
V5 release planning is now narrowed to a V5.11 finite-strain S4 capability
|
||||
checkpoint. The release claim is bounded: finite-membrane-strain S4 production
|
||||
dispatch, stable shell geometry inputs, continuation-path diagnostics, the
|
||||
spherical-cap Shell-4 translational-rim benchmark口径 and a reproducible
|
||||
post-peak load drop.
|
||||
|
||||
The release claim does not include strict full-curve reproduction of
|
||||
`models.sme.spherical_cap_with_central_point_load.pdf` through `uz=-6.2 m`,
|
||||
Shell-4/8/16 digitized reference matching, true pseudo-arclength branch
|
||||
following, or late post-peak GMRES performance close-out. Those items, together
|
||||
with the V5.12 engineering backlog, are deferred to the next version line and
|
||||
must be documented as limitations rather than release blockers.
|
||||
|
||||
## 2026-07-01 V5.12 Close-Out Boundary
|
||||
|
||||
V5.12 is closed as a bounded engineering checkpoint, not as a promise to finish
|
||||
every high-fidelity workflow listed in the original V5 plan.
|
||||
|
||||
V5 delivery includes the already stable subset: internal solver hardening,
|
||||
contact regression evidence, Mohr-Coulomb material and strength-reduction
|
||||
diagnostics, the selected `two_arches` reference-point check, bounded
|
||||
spherical-cap continuation/Riks evidence, small dense generic `*BUCKLING`,
|
||||
static-preload-to-buckling for explicit geometric lines and C3D4/C3D8 solid
|
||||
initial-stress `K_G`, WAVE=0 explicit-pair cyclic symmetry for solid and shell
|
||||
nodes, normal output-directory handling for generic buckling outputs, and the
|
||||
source-size governance cleanup already covered by targeted regression.
|
||||
|
||||
Deferred after V5: full shell preload-to-buckling geometric stiffness,
|
||||
higher-order solid geometric stiffness, automatic cyclic boundary pairing,
|
||||
nonzero harmonic-wave cyclic semantics, full shell FE corrugated preload
|
||||
buckling, production roll-forming process workflow, production cohesive contact
|
||||
integration, high-fidelity example upgrades that depend on those algorithms,
|
||||
and broad longrun/performance matrices.
|
||||
|
||||
The current V5 acceptance claim is therefore limited to the documented bounded
|
||||
subset and its regression tests. Deferred items must stay documented as
|
||||
post-V5 work and must not remain on a V5 must-complete checklist.
|
||||
|
||||
Current local regression evidence on 2026-07-01:
|
||||
`ctest --test-dir build-codex-gcc -L v5_acceptance --output-on-failure`
|
||||
passed 39/39. The focused bounded buckling/cyclic subset also passed 8/8 with
|
||||
`implicit_inp`, `cyclic_symmetry`, `cli_buckling_generic_dense`,
|
||||
`cli_buckling_static_preload_dense`, `cli_buckling_solid_preload_dense`,
|
||||
`buckling_support`, `example_euler_column_buckling_benchmark`, and
|
||||
`example_buckling_corrugated_shell_benchmark`.
|
||||
|
||||
## 验收范围
|
||||
|
||||
当前报告覆盖:
|
||||
@@ -50,6 +98,11 @@ ctest --test-dir build-win-ifx-v5-20-2 -C Release --output-on-failure
|
||||
ctest --test-dir build-win-ifx-v5-20-2 -C Release -L v5_acceptance --output-on-failure
|
||||
ctest --test-dir build-win-gcc-16 -C Release -R "contact_omp1|contact_omp4|perf_contact_pair_omp_consistency" --output-on-failure -V
|
||||
ctest --test-dir build-win-gcc-16 -C Release -R "^(contact_mortar_tangent|restart|contact_multiplier_diag|contact_multiplier_report|contact_omp1|contact_omp4|perf_contact_pair_omp_consistency)$" --output-on-failure
|
||||
cmake --build build-codex-gcc --parallel
|
||||
ctest --test-dir build-codex-gcc -L v5_acceptance --output-on-failure
|
||||
ctest --test-dir build-codex-gcc -R "^example_spherical_cap_point_load_benchmark$" --output-on-failure
|
||||
$env:FEMLITE_SPHERICAL_CAP_NONLINEAR='1'
|
||||
python examples\spherical_cap_with_central_point_load\check_spherical_cap_results.py . build-codex-gcc\femlite.exe build-codex-gcc\example_benchmark\spherical_cap_point_load_bounded
|
||||
```
|
||||
|
||||
## 测试结果
|
||||
@@ -67,6 +120,10 @@ ctest --test-dir build-win-gcc-16 -C Release -R "^(contact_mortar_tangent|restar
|
||||
| `ctest --test-dir build-win-ifx-v5-20-2 -C Release -L v5_acceptance --output-on-failure` | 35/35 passed |
|
||||
| `ctest --test-dir build-win-gcc-16 -C Release -R "contact_omp1|contact_omp4|perf_contact_pair_omp_consistency" --output-on-failure -V` | 3/3 passed |
|
||||
| 0.5.1 V5.3 定向接触审计与 OpenMP smoke | 7/7 passed |
|
||||
| `cmake --build build-codex-gcc --parallel` | passed; all missing V5 acceptance executables generated |
|
||||
| `ctest --test-dir build-codex-gcc -L v5_acceptance --output-on-failure` | 36/36 passed |
|
||||
| `ctest --test-dir build-codex-gcc -R "^example_spherical_cap_point_load_benchmark$" --output-on-failure` | 1/1 passed |
|
||||
| V5.11 bounded spherical-cap nonlinear checker, `FEMLITE_SPHERICAL_CAP_NONLINEAR=1` | passed; 54 accepted increments |
|
||||
|
||||
## 已完成内容
|
||||
|
||||
@@ -79,6 +136,7 @@ ctest --test-dir build-win-gcc-16 -C Release -R "^(contact_mortar_tangent|restar
|
||||
| 滚压 | 辊平移/下压/角速度运动学、正则化牵引、J2 多层截面成形、塑性功、塑性区和回弹指标已由示例 checker 验证。 |
|
||||
| cohesive | cohesive law/state/metrics 覆盖 loading、unloading、mixed-mode damage、complete decohesion、非负耗散和 restart;ball adhesion benchmark 输出滞回、拉脱力、能量和脱粘面积。 |
|
||||
| 颗粒耦合 | `particle_acceptance` 覆盖自由落体、墙碰撞、颗粒堆和颗粒-facet 载荷平衡;dynamic grain container benchmark 验证真实粒子、映射节点力和柔性容器位移。 |
|
||||
| finite-strain S4 | V5.11 已接入 finite-strain S4 生产路径、稳定 shell geometry 输入、continuation path 诊断和球冠 Shell-4 translational-rim bounded postbuckling checker。extended nonlinear checker 运行到 `uz=-3.24 m`,验证 post-peak load drop;完整 PDF 全曲线匹配不作为本报告通过项。 |
|
||||
| benchmark 矩阵 | `docs/v5_benchmark_matrix.md` 映射 V5.2-V5.8 已完成能力到 CTest、目录、指标和容差;`v5_acceptance` 标签可运行当前 V5 验收子集。 |
|
||||
| 发布治理 | `docs/v5_development_plan.md` 为唯一状态入口;`docs/v5_benchmark_matrix.md` 记录可执行矩阵;本报告记录验收结论、限制和多平台复测证据。 |
|
||||
| 多平台复测 | Windows GCC 16、WSL GNU 13.3 和 Windows IntelLLVM 2026.0/MSVC 19.44 均通过默认 CTest 和 `v5_acceptance`;OpenMP contact/performance smoke 通过。 |
|
||||
@@ -94,18 +152,20 @@ ctest --test-dir build-win-gcc-16 -C Release -R "^(contact_mortar_tangent|restar
|
||||
| `examples/roll_forming` springback | springback ratio `0.473154068`, residual displacement `0.0316107559`, plastic work `1.11591736E-05`, 56/81 plastic points |
|
||||
| `examples/ball_adhesion_decohesion` | peak pull-off `119.246023`, dissipated energy `0.451891017`, final failed fraction `1.0` |
|
||||
| `examples/Dynamic_Grain_Packing_of_a_Flexible_Container` | 4 particles, 4 facet contacts, `mapped_steps=40`, max vertical mapped load `3.68E+01`, min center `uz=-7.29240354E-06`, max overlap `3.00615680E-03` |
|
||||
| `examples/spherical_cap_with_central_point_load` bounded nonlinear | 54 accepted increments, final `wn=15.89482`, final `Fn=1.058395`, sampled `Fn=1.340817` at `wn=13.642`; path shows post-peak load drop |
|
||||
|
||||
## 仍需完善内容
|
||||
|
||||
| 领域 | 原因 | 风险 | 用户影响 |
|
||||
|---|---|---|---|
|
||||
| 完整 mortar / AL 一致切线 | 当前已有 multiplier、mortar、friction、多示例 benchmark、0.5.1 multiplier restart audit 和 tangent matrix audit;完整工业级一致切线、非线性长路径和更大规模并行 benchmark 仍需收束 | 大规模非线性接触可能需要更强收敛控制 | 当前可运行紧凑接触 benchmark 和接触审计回归;不能宣称覆盖所有工业接触场景 |
|
||||
| 完整 mortar / AL 一致切线 | 当前已有 multiplier、mortar、friction、多示例 benchmark、0.5.1 multiplier restart audit 和 tangent matrix audit;0.5.2 追加摩擦历史 stick/slip restart 审计、BiCGSTAB/GMRES 失败状态诊断和 64 面片 4 步 OpenMP force/tangent/cache 路径一致性;完整工业级一致切线和真实非线性长路径仍移入后续版本 | 大规模非线性接触可能需要更强收敛控制 | 当前可运行紧凑接触 benchmark、接触审计回归和路径级并行一致性;不能宣称覆盖所有工业接触场景 |
|
||||
| Mohr-Coulomb 结构级自动 trial 重求解 | 材料点、活动集算法一致切线和 FOS 曲线 benchmark 已完成,完整结构非线性失稳判据和 PDF 位移/塑性云图仍需扩展 | 复杂边坡或三维岩土模型可能过早/过晚判稳 | 当前适合强度折减曲线验证,不等价于完整岩土生产求解器 |
|
||||
| 通用 `*BUCKLING` step | 已有内部特征值和 benchmark 工具,主 `femlite` 输入流程尚未提供通用 buckling step | 用户需要通过 benchmark 工具验证屈曲,而非普通 INP 直接求解 | 小规模解析/紧凑循环 benchmark 可用,通用屈曲工况仍需后续版本 |
|
||||
| 完整三维滚压长跑 | 当前是辊运动学和紧凑多层 J2 截面 springback benchmark | 真实工艺网格、restart 多 step 和长时间稳定性尚未验证 | 用户可验证核心算法路径,但不能直接替代工业 roll forming 工艺仿真 |
|
||||
| 完整 FE cohesive 接触 step | 当前 cohesive law/state/metrics 和 ring benchmark 已完成,主接触流程切换与切线仍需集成 | 粘附/普通接触切换和 restart 长路径仍有风险 | 用户可使用 benchmark 验证 cohesive 模型,不应把它当作通用 FE cohesive 接触 |
|
||||
| 颗粒大规模 longrun | 当前 V5.8 限定内置离散球和紧凑柔性容器 benchmark | 大颗粒数性能、邻域搜索和长时间能量稳定性仍需验证 | 用户可验证双向映射闭环,但不能把它当作工业 DEM 装填求解器 |
|
||||
| 后续 longrun 发布节奏 | 正式 `v0.5.0` 标签已指向包含 20.2 多平台复测和 20.4 文档治理的节点;`main` 后续提升到 `0.5.1` | 更大规模 longrun 和 V5.3-V5.7 主流程工程化仍需后续版本继续收束 | 不影响 `v0.5.0` 阶段验收结论;后续发布应明确新的 tag/commit |
|
||||
| 球冠完整 PDF 全曲线 | V5.11 验收收窄为 finite-strain S4 bounded postbuckling capability;完整 `uz=-6.2 m`、Shell-4/8/16 digitized reference matching、later restiffening 和 late GMRES 性能优化移入后续版本 | 严格参考曲线复现仍需更强 continuation 与性能工作 | 用户可使用 V5.11 验证 S4 finite-strain 生产路径和 post-peak load drop,不能把它声明为完整 NAFEMS/PDF 全曲线复现 |
|
||||
| 后续 longrun 发布节奏 | 正式 `v0.5.0` 标签已指向包含 20.2 多平台复测和 20.4 文档治理的节点;`main` 后续提升到 `0.5.2` | 更大规模 longrun 和 V5.3-V5.7 主流程工程化仍需后续版本继续收束 | 不影响 `v0.5.0` 阶段验收结论;后续发布应明确新的 tag/commit |
|
||||
|
||||
## 暂缓或不纳入当前模块
|
||||
|
||||
|
||||