# FemLite 0.6.0 Benchmark And Acceptance Matrix Date: 2026-07-01 Scope: executable evidence for the 0.6.0 nonlinear lifecycle foundation and rollback audit release. Current local 0.6.0 evidence on `build-codex-gcc`: - `cmake --build build-codex-gcc --parallel` passed. - `ctest --test-dir build-codex-gcc -R "^(solver_implicit|implicit_inp|restart|contact_mortar_report|contact_multiplier_report|cohesive_contact|particle_acceptance)$" --output-on-failure` passed 7/7. - `ctest --test-dir build-codex-gcc -L v5_acceptance --output-on-failure` passed 39/39. - `git diff --check` passed with line-ending normalization warnings only. ## Release Boundary 0.6.0 delivers lifecycle diagnostics and rollback audit infrastructure for the covered nonlinear subset. It does not deliver a complete industrial AL/mortar consistent tangent rewrite, generalized mixed-control continuation, cohesive contact mainline integration, DEM/FEM subcycling or a production roll-forming workflow. ## 0.6.0 Matrix | Area | Code or output target | Test/checker | Acceptance evidence | |---|---|---|---| | Lifecycle core | `src/solver/fem_nonlinear_lifecycle.f90` | `nonlinear_lifecycle` | Stable event names, empty snapshot, event history, arc defaults and audit status transitions. | | Static nonlinear lifecycle | `src/solver/fem_solver_static_nonlinear.f90` | `solver_implicit` | Increment/trial/iteration/result/commit/accept/reject/cutback events are observable without changing convergence rules. | | Nonlinear Newmark lifecycle | `src/solver/fem_solver_newmark.f90` | `solver_implicit` | Dynamic nonlinear success and rejection paths expose lifecycle state. | | Riks/arc lifecycle | static nonlinear Riks path | `solver_implicit` | Accepted path records lifecycle accept, load factor, arc residual and path append state. | | Material rollback audit | `src/element/fem_element_state.f90` | `solver_implicit`, `nonlinear_lifecycle` | Covered material state rollback is audited by checksum and status counters. | | Contact rollback audit | `src/boundary/fem_contact_multiplier.f90` | `contact`, `restart` | Contact multiplier trial/commit/rollback contributes audit status without changing contact physics. | | Cohesive audit | `src/boundary/fem_cohesive_state.f90` | `cohesive_contact` | Compact cohesive state rollback/commit emits lifecycle audit status. | | Particle audit | `src/particle/fem_particle_audit.f90` | `particle_step` | Particle audit pass/fail maps into lifecycle commit/rollback-failed status. | | Lifecycle CSV output | `continuation_path.csv` | `solver_implicit` | Old path columns remain stable; lifecycle event/status, increment/iteration and accept/reject counters are appended. | | Lifecycle restart | restart version 5 optional block | `restart` | Accepted-increment lifecycle diagnostics round-trip; files without the optional block still read. | ## Regression Commands ```powershell cmake --build build-codex-gcc --parallel ctest --test-dir build-codex-gcc -R "^(solver_implicit|implicit_inp|restart|contact_mortar_report|contact_multiplier_report|cohesive_contact|particle_acceptance)$" --output-on-failure ctest --test-dir build-codex-gcc -L v5_acceptance --output-on-failure git diff --check ``` Additional focused lifecycle evidence used during development: ```powershell ctest --test-dir build-codex-gcc -R "^(nonlinear_lifecycle|solver_implicit|restart|contact|cohesive_contact|particle_step)$" --output-on-failure ```